Dubai Metro: World longest fully Automated Rail System

News, Videos | 5,280 views | 6 Comments

Tags: , , , ,

 
 
 
 

The Metro network will be fully integrated within the network operated by the Roads & Transport Authority (RTA), a body created in 2005. Routes will be organised around the backbone provided by the rail system. Taxi stations and park-and-ride facilities will be included in key Metro stations to further enhance the system’s role.

Groundworks began in February 2006, centred around the 52.1km Red Line. In August 2006 a second contract worth US$.12bn was awarded to the MHI consortium for bulding the 17.6km Green Line, intersecting with Red Line at two stations.

Green Line will link strategic locations Dubai Airport and Healthcare City. The aim is to open in 2010, one year after the Red Line. In June 2007 Serco (operator of the London Docklands Light Railway) was named as preferred bidder for initial consultation and the system’s operation and maintenance. The L400m contract, potentially for up to 12 and a half years, relates to the first two lines.

The 52.1km (32.5 mile) Red Line will have 29 stations, four of which will be underground. It will run from Rashidiva to Jebel Ali passing the American University of Dubai. It is planned that the first phase will open in 2009. The whole 52.1km is expected to take 60 minutes to travel, with an estimated 32,000 passengers per hour.

The 17.6km Green Line which will have 14 stations – six underground and eight at ground level – from Al Ittihad Square to Rashidiya bus station through Deira City Centre and Dubai Airport Terminals 1 and 3. It will be progressively extended to serve the Deira and Bur Dubai central areas and Souks up to Burjuman and Wafi shopping centres. Interchange stations will be built at Al Ittihad Square and Burjuman with direct connections to the Red Line.

Underground sections in the city centre are on the Red Line from the intersection of Sheikh Rashid and Sheikh Khalifa Bin Zayed roads to just before the intersection of Salahuddin and Abu Bakr Al Siddique roads and from Garhoud to Oud Metha Road on the Green Line.

Related Posts

You might also like

Dubai Metro will be launched on September 9
Dubai to build 97 Air-Conditioned Pedestrian Crossings by March 2010
More than Million had travelled on Dubai Metro since its launched
Air-Conditioned Pedestrian Network: Another Step towards Green Dubai
13 Dubai Metro station naming rights still available

Comments (6)

 

  1. [...] of reaching for the for sun too soon. As we drove around the city I was told to look at the rail system, amusement parks, desalination plants, entire downtown cores or any of the several mega projects. [...]

  2. [...] will have 97 pedestrian crossings by March 2010 when the Dubai Metro is completed. All the 47 stations of the Dubai Metro will have pedestrian crossings, including 37 [...]

  3. ahmed says:

    ola com satesa
    salam dubai

  4. ahmed says:

    ola com satesa
    salam dubai
    españa jenseya morrco catalaña tarrgona tekeyo arba chokerane dubai

  5. anayatullah says:

    i love dubai its people and i like to seek job in dubai bacause i wonder to see dubai

  6. BAKO MALLAM says:

    I LIKE AND LOVE THE DUBAI BECAUSE IT IS PEACE AND NICE
    CONTRY

Leave a Reply